Our Sydney services are hosted from the GlobalSwitch Sydney West data centre. Minimum N+1 redundancy is provided in all infrastructure including air conditioning, power and UPS systems with further technical inclusions & features outlined below.

View pricing and a comparison of all our Data Centre offerings on our Data Centre Services page.

Data Centre Basics

Data Centre Location: Harris Street, Sydney West - located less than 1.5km from the financial district and city centre.
Capacity: 41,575 sq m of gross space
Utility power supply capacity: 45MVA

Power Specifications

  • 33kV utility supply with N+1 redundancy
  • Technical (IT) power and mechanical systems supplied by on-site Diesel Rotary UPS with N+1 redundancy
  • Fully diverse power distribution to technical areas
  • On-site fuel storage to support 24 hours at full capacity with 24x7x365 fuel delivery
  • Offering 1,000 W/m2 as standard, with higher power density solutions fully supported

Controlled Environment

  • 31.5MW of total cooling provision
  • Minimum N+1 resilience on all systems
  • CRAC units control temperature and humidity in technical space within the recommended range of ASHRAE TC9.9
  • Diverse distribution pipework throughout
  • Chilled water cooling system
  • In rack cooling capability if required

Fire Detection and Suppression

  • Analogue addressable fire detection system in all areas
  • Aspirated early warning smoke detection system (monitored 24x7x365)
  • Inergen gas suppression system in technical areas with dry pipe pre-action sprinkler for additional resiliency

Data Centre Security & Access

  • Operations Centre manned 24x7x365
  • Security guard patrols 24x7x365
  • Continuous CCTV surveillance of external and internal areas, CCTV records kept for 31 days
  • Comprehensive intruder detection and alarms to all areas
  • Strict access control procedures to ISO 27001:2013
  • Access control using proximity card readers and biometric systems
  • Physical access via mantrap
  • Secure managed delivery and loading area available 24x7x365
  • Secure staging available, if required

Service Level Agreement

99.9 - 99.99% Power, Air